Pattern 28·Hybrid·L3

Percentage + Time & Work

Very High FrequencyMust Master 90–120 sec

USE WHEN

Worker efficiency changes by a percentage, or workforce changes during the job.

BEST METHOD

LCM Work Method

TARGET

90–120 sec

MASTERY

not started

Recognition Cues

  • efficiency % changes
  • time/work relationship
  • join/leave workers

How to Recognise

Worker efficiency changes by a percentage, or workforce changes during the job.

Core Concept

Work rate is proportional to efficiency; time is inversely proportional to efficiency for fixed work.

Work=Rate×Time;ifefficiencyrisesx%,timemultiplier=1/(1+x/100).Work = Rate\times Time; if efficiency rises x\%, time multiplier = 1/(1+x/100).Work=Rate×Time;ifefficiencyrisesx%,timemultiplier=1/(1+x/100).

Athena Shortcut

Use efficiency units and LCM total work.

Alternative Method · LCM Work Method

Take total work as an LCM-based unit model and adjust rates after % changes.

Timed drill

Identify the base or invariant before you calculate.

2:00

Attempt first · Standard Example

A worker becomes 25% more efficient. By what % does time fall for same work?

Attempt first · CAT-Level Example

A:B efficiency=3:2. Together they finish in 12 days. After 4 days, A's efficiency falls 25%. Extra time?

Common Trap

  • A 25% efficiency increase does not mean a 25% time decrease.

3-level practice ladder

Attempt all three before checking solutions

Foundation

Efficiency falls 20%. By what percentage does time rise for the same work?

CAT Standard

Efficiency rises 50%. By what percentage does time fall for the same work?

Advanced / Hybrid

A:B efficiency=3:2 and together they finish a job in 12 days. After 4 days, A's efficiency falls 25%. Find total completion time.

PYQ Mapping

Related archetypeCAT

This pattern is a recurring CAT arithmetic archetype.

Pattern Connections

#09 Price × Consumption × Expenditure #24 Percentage + Ratio #29 Percentage + Time, Speed & Distance
Sign in to save progressAll patterns

Learning flow

  1. 1Recognition Cues
  2. 2How to Recognise
  3. 3Core Concept
  4. 4Formula
  5. 5Athena Shortcut
  6. 6Alternative Method
  7. 7Timed Drill
  8. 8Standard Example
  9. 9CAT-Level Example
  10. 10Common Trap
  11. 11Practice Ladder
  12. 12PYQ Mapping
  13. 13Connections
  14. 14Mastery

Attempt every example before opening its answer.